Baxi Potterton Boiler Wartungshandbuch Seite 2

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 56
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 1
2
© Baxi Heating UK Ltd 2009
Natural Gas
Potterton Performa 30 HE
G.C.N
o
47 393 13
Building Regulations and the Benchmark Commissioning
Checklist
Building Regulations (England & Wales) require notification of the
installation of a heating appliance to the relevant Local Authority Building
Control Department. From 1 April 2005 this can be achieved via a
Competent Persons Self Certification Scheme as an option to notifying
the Local Authority directly. Similar arrangements will follow for Scotland
and will apply in Northern Ireland from 1 January 2006.
The Health & Safety Executive operates the ‘Gas Safe Register’, a self-
certification scheme for gas heating appliances.
These arrangements represent a change from the situation whereby
compliance with Building Regulations was accepted as being
demonstrated by completion of the Benchmark Logbook (which was
then left on site with the customer).
With the introduction of Self Certification Schemes, the Benchmark
Logbook is being withdrawn. However, a similar document in the form
of a commissioning checklist and service interval record is incorporated
at the back of these instructions.
This company is a member of the Benchmark initiative and fully supports
the aims of the programme. Its aim is to improve the standards of
installation and commissioning of central heating systems in the UK and
to encourage the regular servicing of all central heating systems to
ensure safety and efficiency.
Building Regulations require that installations should comply with
manufacturer's instructions. It is therefore important that the
commissioning checklist is completed by the installer. The relevant
section of Building Regulations only relates to dwellings. Therefore the
checklist only applies if the appliance is being installed in a dwelling or
some related structure.
The flowchart opposite gives guidance for installers on the process
necessary to ensure compliance with Building Regulations.
Legislation 4
1.0 Introduction 6
2.0 General Layout 7
3.0 Appliance Operation 8
4.0 Technical Data 9
5.0 Dimensions and Fixings 10
6.0 System Details 11
7.0 Site Requirements 14
8.0 Flue Options 18
9.0 Plume Displacement 23
10.0 Installation 27
11.0 Commissioning the Boiler 32
12.0 Completion 34
13.0 Servicing the Boiler 35
14.0 Changing Components 37
15.0 Illustrated Wiring Diagram 47
16.0 Fault Finding 48
17.0 Short Parts List 53
Benchmark Checklist 54
Section Page
Contents
© Baxi Heating UK Ltd 2009 All rights reserved. No part of this publication may be reproduced or transmitted in
any form or by any means, or stored in any retrieval system of any nature (including in any database), in each case
whether electronic, mechanical, recording or otherwise, without the prior written permission of the copyright
owner, except for permitted fair dealing under Copyrights, Designs and Patents Act 1988.
Applications for the copyright owner’s permission to reproduce or make other use of any part of this publication
should be made, giving details of the proposed use, to the following address:
The Company Secretary, Baxi Heating UK Ltd, The Wyvern Business Park, Stanier Way, Derby, DE21 6BF.
Full acknowledgement of author and source must be given.
WARNING: Any person who does any unauthorised act in relation to a copyright work may be liable to criminal
prosecution and civil claims for damages.
0086
ISO 9001
FM 00866
The Benchmark Scheme
Benchmark places responsibilities on both manufacturers and installers. The purpose is to
ensure that customers are provided with the correct equipment for their needs, that it is
installed, commissioned and serviced in accordance with the manufacturer’s instructions
by competent persons and that it meets the requirements of the appropriate Building
Regulations. The Benchmark Checklist can be used to demonstrate compliance with
Building Regulations and should be provided to the customer for future reference.
Installers are required to carry out installation, commissioning and servicing work in
accordance with the Benchmark Code of Practice which is available from the Heating
and Hotwater Industry Council who manage and promote the Scheme. Visit
www.centralheating.co.uk for more information.
Seitenansicht 1
1 2 3 4 5 6 7 ... 55 56

Kommentare zu diesen Handbüchern

Keine Kommentare