Baxi Potterton Boiler Wartungshandbuch Seite 1

Stöbern Sie online oder laden Sie Wartungshandbuch nach Warmwasserbereiter & Kessel Baxi Potterton Boiler herunter. Baxi Potterton Boiler Technical data Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 56
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
© Baxi Heating UK Ltd 2008
Installation & Service Instructions
These instructions include the Benchmark Commissioning
Checklist and should be left with the user for safe keeping.
Performa 30 HE
Condensing
Combination Boiler
You can rely on
Seitenansicht 0
1 2 3 4 5 6 ... 55 56

Inhaltsverzeichnis

Seite 1 - Performa 30 HE

© Baxi Heating UK Ltd 2008Installation & Service InstructionsThese instructions include the Benchmark CommissioningChecklist and should be left wi

Seite 2 - Contents

5.0 Dimensions and Fixings10© Baxi Heating UK Ltd 2009DimensionsA 780mmB 345mmC 450mmD 116mm Ø Min.E 185mmF 190mmG 131mm360° Orientation Tube Ø 100mmD

Seite 3 - © Baxi Heating UK Ltd 2009

6.0 System Details11© Baxi Heating UK Ltd 20096.1 Information1. The Potterton Performa 30 HE Condensing CombinationBoiler is ‘Water Byelaws Scheme - A

Seite 4 - Legislation

6.0 System Details12© Baxi Heating UK Ltd 20096.5 System Filling and Pressurising1. A filling point connection on the central heating returnpipework m

Seite 5 - Safe Manual Handling

6.0 System Details13© Baxi Heating UK Ltd 20096.8 Domestic Hot Water Circuit (Fig. 7)1. All DHW circuits, connections, fittings, etc. should befully i

Seite 6 - 1.0 Introduction

7.0 Site Requirements14© Baxi Heating UK Ltd 20097.1 Location1. The boiler may be fitted to any suitable wall with theflue passing through an outside

Seite 7 - 2.0 General Layout

7.0 Site Requirements15© Baxi Heating UK Ltd 20097.3 Ventilation of Compartments1. Where the appliance is installed in a cupboard orcompartment, no ai

Seite 8 - 3.0 Appliance Operation

7.0 Site Requirements16© Baxi Heating UK Ltd 20097.6 Condensate DrainFAILURE TO INSTALL THE CONDENSATEDISCHARGE PIPEWORK CORRECTLY WILL AFFECTTHE RELI

Seite 9 - Pump - Available Head

7.0 Site Requirements17© Baxi Heating UK Ltd 20097.7 FlueNOTE: Due to the nature of the boiler a plume of watervapour will be discharged from the flue

Seite 10 - Dimensions

8.0 Flue Options18© Baxi Heating UK Ltd 2009The Potterton Performa 30 HE can be fitted with eitherhorizontal, vertical or twin flue systems. 8.1 Horiz

Seite 11 - 6.0 System Details

8.0 Flue Options19© Baxi Heating UK Ltd 2009VerticalFlues(Twin Pipe)YXVerticalFluesYXThe total equivalentlength for this example is= 6.5 metres.1m ext

Seite 12

2© Baxi Heating UK Ltd 2009Natural GasPotterton Performa 30 HEG.C.No47 393 13Building Regulations and the Benchmark CommissioningChecklistBuilding Reg

Seite 13

8.0 Flue Options20© Baxi Heating UK Ltd 2009Key Accessory Size Baxi Code NoFLUE GROUP AConcentric Flue System 100mm diameterA1 Horizontal flue Termina

Seite 14 - 7.0 Site Requirements

21© Baxi Heating UK Ltd 20098.0 Flue OptionsFor Twin Flue Systems fit the adaptors as follows:-8.4 Flue Duct Adaptor1. Engage the flue duct adaptor on

Seite 15

8.0 Flue Options22© Baxi Heating UK Ltd 2009Fig. 13Fig. 14100mm685mmPush Fit AdaptorAir DuctFlue DuctCut the sameamount off theAir Duct &Flue Duct

Seite 16

9.0 Plume Displacement23© Baxi Heating UK Ltd 20099.1 Plume Displacement Kit (Fig. 14b)Kit No 5118638Content of kit1 0.9m 60/100 Concentric Flue1 1m 6

Seite 17

9.0 Plume Displacement24© Baxi Heating UK Ltd 2009Concentric 60/100 Flue60Ø ExhaustXYFig. 1720160 Ø Exhaust (metres)Concentric 60/100 Flue (metres)021

Seite 18 - 8.0 Flue Options

9.0 Plume Displacement25© Baxi Heating UK Ltd 2009Min. 2 metresFig. 1950mmFlue TrimPosition of ‘Jubilee’ ClipscrewFig. 2430mm30mmFig. 21Fig. 23Fig. 20

Seite 19

9.0 Plume Displacement26© Baxi Heating UK Ltd 20099.3 General Fitting Notes (cont.)15. For aesthetic purposes it is permissible to route the60Ø exhaus

Seite 20

10.0 Installation27© Baxi Heating UK Ltd 200910.1 Initial PreparationThe gas supply, gas type and pressure must bechecked for suitability before conne

Seite 21

10.0 Installation28© Baxi Heating UK Ltd 200910.4 Fitting The Boiler1. Remove the sealing caps from the boiler connections.2. Lift the boiler using th

Seite 22

10.0 Installation29© Baxi Heating UK Ltd 200910.7 Fitting The FlueHORIZONTAL FLUE1. The standard flue is suitable for lengths between100mm minimum and

Seite 23 - 9.0 Plume Displacement

Installer Notification Guidelines3© Baxi Heating UK Ltd 2009Choose BuildingRegulations NotificationRouteContact your relevant LocalAuthority Building

Seite 24

10.0 Installation30© Baxi Heating UK Ltd 200910.7 Fitting the Flue (Cont)5. Mark dimension ‘Y’ on the flue as shown (Fig. 37).Carefully cut the waste

Seite 25

10.0 Installation31© Baxi Heating UK Ltd 200910.8 Making The Electrical ConnectionsTo connect the mains input cable proceed as follows:-1. Slacken the

Seite 26 - 500mm Min

11.0 Commissioning the Boiler32© Baxi Heating UK Ltd 200911.1 Commissioning the Boiler1. Reference should be made to BS 5449 Section 5when commissioni

Seite 27 - 10.0 Installation

11.0 Commissioning the Boiler33© Baxi Heating UK Ltd 2009OUTMINPressure Test Point Sealing ScrewGas ValveFig. 48Selector SwitchCentral Heating Tempera

Seite 28

12.0 Completion34© Baxi Heating UK Ltd 200912.1 Completion 1. Hinge the facia panel upwards and refit the case frontpanel. Tighten the securing screws

Seite 29

13.0 Servicing the Boiler35© Baxi Heating UK Ltd 200913 .1 Annual Servicing1. For reasons of safety and economy, it isrecommended that the boiler is s

Seite 30

13.0 Servicing the Boiler36© Baxi Heating UK Ltd 200913.1 Annual Servicing (Cont)11. Ease the front edge of the left hand baffle upwards,disengaging t

Seite 31

14.0 Changing Components37© Baxi Heating UK Ltd 2009IMPORTANT: When changing components ensurethat both the gas and electrical supplies to theboiler a

Seite 32 - 11.0 Commissioning the Boiler

14.0 Changing Components38© Baxi Heating UK Ltd 200914.3 Heat Exchanger (Fig. 64)1. Remove the fan as described in section 14.1.2. Drain the primary c

Seite 33

14.0 Changing Components39© Baxi Heating UK Ltd 200914.5 Injectors (Fig. 66)1. Remove the burner as described in Section 14.4.2. Undo the screws secur

Seite 34 - 12.0 Completion

Legislation4© Baxi Heating UK Ltd 2009Codes of Practice, most recent version should be usedThis company declare that no substances harmful to healthar

Seite 35 - 13.0 Servicing the Boiler

14.0 Changing Components40© Baxi Heating UK Ltd 200914.8 Gas Valve (Fig. 68)1. Undo the nut on the gas feed pipe under the boiler.2. Completely undo t

Seite 36

14.0 Changing Components41© Baxi Heating UK Ltd 200914.12 Pump - Head Only (Fig. 71)1. Drain the primary circuit and remove the sockethead screws secu

Seite 37 - 14.0 Changing Components

14.0 Changing Components42© Baxi Heating UK Ltd 200914.15 Pressure Gauge (Figs. 74 & 75)1. Drain the primary circuit and undo the nut on thepress

Seite 38

14.0 Changing Components43© Baxi Heating UK Ltd 200914.18 Pressure Relief Valve (Fig. 78)1. Drain the primary circuit.2. Disconnect the discharge pipe

Seite 39

14.0 Changing Components44© Baxi Heating UK Ltd 200914.21 Plate Heat Exchanger (Fig. 67)1. Drain the primary circuit.2. While supporting the heat exch

Seite 40

14.0 Changing Components45© Baxi Heating UK Ltd 200914.22 Diverter Valve Assembly (Cont)Pressure Differential Valve (Fig. 84)1. Remove the pressure di

Seite 41

14.0 Changing Components46© Baxi Heating UK Ltd 200914.24 Secondary Heat Exchanger (Fig. 87)1. Drain the primary circuit2. Undo the four screws securi

Seite 42

15.0 Illustrated Wiring Diagram47© Baxi Heating UK Ltd 2009- brown- black- blue- redbrbkbr - green- green / yellow- whitegg/yw Optional TimersDomestic

Seite 43

48© Baxi Heating UK Ltd 200916.0 Fault FindingCarry out initial fault finding checks1. Check that gas, water and electrical supplies are available at

Seite 44

49© Baxi Heating UK Ltd 200916.0 Fault FindingDomestic Hot Water - Follow operational sequenceTurn selector to neon illuminatedPrimary flow switch

Seite 45

Safe Manual Handling5© Baxi Heating UK Ltd 2009GeneralThe following advice should be adhered to, from when first handling the boiler to the final stag

Seite 46

50© Baxi Heating UK Ltd 200916.0 Fault FindingFault Finding Solutions Sections A to EIs there 230V at:Is there 230V at:Main terminals L and N Check el

Seite 47 - Control PCB

51© Baxi Heating UK Ltd 200916.0 Fault FindingCheck and correct if necessary1. Electrical and pressure tube connections2. Blockage of pressure tubes3.

Seite 48 - 16.0 Fault Finding

52© Baxi Heating UK Ltd 200916.0 Fault FindingCheck and correct if necessary1. Flame sensing electrode and lead connections2. Electrode positionFlame

Seite 49

17.0 Short Parts List53© Baxi Heating UK Ltd 2009Short Parts ListKey G.C. Description ManufacturersNo. No. Part No.22 Fan 511243023 Pressure Switch 24

Seite 50

GAS BOILER SYSTEM COMMISSIONING CHECKLISTCONTROLS Tick the appropriate boxesTime and Temperature Control to Heating Room Thermostat and Programma

Seite 51

SERVICE RECORDIt is recommended that your heating system is serviced regularly and that the appropriate Service Record is completed.Service ProviderBe

Seite 52

© Baxi Heating UK Ltd 2009UK Comp No5111815 - Iss 7 - 7/09POTTERTONA Trading Division of Baxi Heating UK Ltd (3879156)a Division of Baxi GroupBrooks H

Seite 53 - 17.0 Short Parts List

1.1 Description1. The Potterton Performa 30 HE is a fully automatic gasfired wall mounted condensing combination boiler. It isroom sealed and fan assi

Seite 54

2.0 General Layout7© Baxi Heating UK Ltd 20092.1 Layout1. Air Pressure Switch2. Expansion Vessel3. Burner Manifold4. Automatic Air Vent5. DHW Plate He

Seite 55 - SERVICE RECORD

3.0 Appliance Operation8© Baxi Heating UK Ltd 2009NOTE: All delay timers mentioned in 3.1 and 3.2 areoverridden by domestic hot water demand.3.1 Centr

Seite 56 - 5111815 - Iss 7 - 7/09

4.0 Technical Data9© Baxi Heating UK Ltd 20094.1 Performa 30 HEFlue Terminal Diameter 100mmDimensions Projection 125mmOutercase DimensionsCasing Heigh

Kommentare zu diesen Handbüchern

Keine Kommentare